The Asian Development Bank has approved two loans totalling $468 million to help Pakistan farm through a changing climate, funding sturdier irrigation in Khyber Pakhtunkhwa and flood control in Punjab. The bank says the two projects should strengthen food security and improve the lives of about 728,000 people.
The approval, announced from Manila on Friday, 27 November, is one of the largest single commitments the bank has made to Pakistan’s agriculture in recent years. Both loans are concessional, meaning they carry easier terms than commercial borrowing, and both are aimed at the same underlying problem: water that arrives at the wrong time, in the wrong place, or not at all.
For farmers in the two provinces, that problem is not abstract. Erratic rainfall, recurring floods and water shortages have made farming steadily harder to plan, and a bad season can wipe out a smallholder’s income for the year. The new financing is designed to take some of that risk out of farming, by making irrigation more reliable where water is scarce and by turning floodwater from a threat into a resource where it arrives in sudden, destructive bursts.
Two loans, two very different water problems
The larger of the two loans, $260 million, goes to Punjab, where the challenge is too much water arriving too fast. The smaller, $208 million, goes to Khyber Pakhtunkhwa, where the challenge is getting water to farms reliably at all. The Asian Development Bank says the two projects together will improve water and agriculture management, boost rural livelihoods and strengthen communities against climate-related shocks.
In Khyber Pakhtunkhwa, the money will fund the Resilient Irrigated Agriculture Livelihoods Development Project, focused on the districts of Nowshera, Swabi and Upper Chitral. The aim is to raise agricultural productivity and lift the incomes of smallholder farmers through irrigation systems built to withstand floods and droughts, alongside modern farming technologies and training.
Planning documents show the work includes rehabilitating the Pehur Main Canal, building the Mulkhow Irrigation Distribution System and extending the Pehur High Level Canal. Canals like these are the lifelines of farming in the province: when they work, water reaches fields on time; when they silt up or break, whole harvests are put at risk. The project will construct and rehabilitate irrigation systems to make them more resilient to disasters, while promoting modern water management and smart farming methods.
The Khyber Pakhtunkhwa project also carries a specific focus on women. It includes livelihoods training for women and measures to give them a greater say in how water is managed, as well as bringing water closer to where it is used, which cuts down the unpaid labour of fetching it. In many farming households, that work falls on women and girls, and reliable water close to home frees up hours every day.
Taming Punjab’s hill torrents
The Punjab project tackles a problem familiar to anyone who has watched the monsoon in the province’s south. Hill torrents rush down from the Koh-e-Suleman foothills into Dera Ghazi Khan and Rajanpur, arriving as flash floods that damage crops, homes and roads, and then vanishing, leaving the land dry again weeks later.
The $260 million Integrated Hill Torrent Management Project is designed to catch that water instead of simply surviving it. It will build water retention, drainage and flood protection infrastructure, and expand spate irrigation, a traditional technique in which floodwater is deliberately spread across fields to water crops and recharge groundwater.
Alongside the engineering, the project will use nature-based approaches, restoring ecosystems and using seasonal flood flows to improve water access for communities. The idea is that the same water that today destroys a harvest can be slowed, stored and put to work, reducing flood risk in the hills while easing shortages on the plains below.
For the districts involved, the difference could be significant. Dera Ghazi Khan and Rajanpur are among Punjab’s poorer farming areas, and their households have little cushion when a flood takes a crop or a dry spell follows. Infrastructure that holds water back in the hills and releases it in a controlled way addresses both ends of that cycle at once.
Why the money matters now
The timing of the approval is no accident. Pakistan’s farming sector has spent the past few years absorbing one climate shock after another, from devastating floods to shifting rainfall patterns, and the cost of each one lands hardest on small farmers with the least to fall back on.
It also comes at a moment when international climate finance is under strain. The financing was approved just as questions are being asked about where money for climate adaptation will come from, after the COP31 climate talks collapsed without a deal. In that context, a $468 million commitment to two concrete, shovel-ready areas of adaptation carries weight beyond its size: it shows that funding for practical resilience work is still flowing, even while the big negotiations stall.
The bank’s country director for Pakistan, Emma Fan, said the projects would “significantly contribute to strengthening food security, while responding to growing environmental pressures and the impacts of the changing climate”. Food security is the thread that ties the two projects together. When irrigation fails or floods destroy a harvest, the effects ripple outward, from farm incomes to food prices in cities.
The approval also continues a busy month for the bank in Pakistan. Earlier in November, it approved a separate $500 million loan to strengthen the country’s disaster resilience. Taken together, the two approvals point to a clear direction in the bank’s Pakistan programme: less emphasis on responding after disasters strike, and more on the infrastructure that stops them from becoming disasters in the first place.
What happens next
Approval is the starting point, not the finish line. The bank has not announced when construction will begin under either project, and it has not published the loans’ interest rates or repayment periods. The detailed work, from final designs to procurement, will now follow through the government channels that handle foreign-funded projects.
What is clear is the scale of the task. Rebuilding canal systems across three districts in Khyber Pakhtunkhwa and putting flood management infrastructure across the hill torrent areas of southern Punjab will take years, not months. The benefits, though, are designed to last longer still: canals and floodworks, once built and properly maintained, serve farming communities for decades.
For the roughly 728,000 people the bank expects the projects to reach, the test will be practical rather than financial. Water arriving when the crop needs it, floodwater that waters a field instead of washing it away, and a harvest that survives the season. If the two projects deliver on that, the $468 million will have bought something Pakistan’s farming families value more than any announcement: a little more certainty in an uncertain climate.


